• +994 12 310 2335
  • Ahmad Racabli Str. No:222 Baku
  • info@aemgroup.az
AEM Group
  • HOMEPAGE
  • ABOUT US
  • SERVICES
  • PROJECTS
  • E-CATALOGUE
  • CONTACT
  • English
    • Türkçe
    • Русский
  • LERIK DRINKING WATER-WASTEWATER TREATMENT PLANT
  • LERIK DRINKING WATER-WASTEWATER TREATMENT PLANT
  • LERIK DRINKING WATER-WASTEWATER TREATMENT PLANT
  • LERIK DRINKING WATER-WASTEWATER TREATMENT PLANT
  • LERIK DRINKING WATER-WASTEWATER TREATMENT PLANT

LERIK DRINKING WATER-WASTEWATER TREATMENT PLANT

    • LOCATION:  LERIK, AZERBAIJAN
    • DATE: 2018
    • MAIN CONTRACTOR: KOPRU BINA TIKINTI
    • PROJECT TYPE: MEP
    • CONSTRUCTION SITE: 7000 m2

    PROJECT SCOPE
    3000 M3/DAY (DRINKING WATER)
    5000 M3/DAY (WASTEWATER)

Copyright © 2015. ThemeMakers . All rights reserved
Developed by KlbTheme